Aug 15, 2025

Have you ever wondered why some driveways start to crack and crumble only a few years after installation, while others last decades? The truth is, it often comes down to mistakes made during the installation process.

If you’re planning to install a new driveway in the Greater Vancouver area, here are the top mistakes you’ll want to avoid:

1. Ignoring Drainage

Water is the number one enemy of both asphalt and concrete. Without proper grading or drainage systems, water seeps in, freezes, and expands, leading to cracks and potholes. Always ensure your driveway has the right slope and, if needed, drainage installation.

2. Choosing the Wrong Material for the Climate

In Metro Vancouver, our heavy rainfall means asphalt paving is often more flexible and forgiving than concrete. However, for high-end finishes, decorative concrete driveways may be the better option. The mistake? Picking materials based only on price rather than suitability.

3. Skipping the Base Preparation

A driveway is only as strong as the base underneath it. Cutting corners on excavation, grading, and base compaction is a recipe for early failure. Learn more about the importance of excavation and grading. Don’t skip it.

4. Not Considering Future Use

Will your driveway handle just family cars, heavy trucks, RVs, or work vehicles? Many homeowners forget to account for load capacity, which leads to premature surface damage. Consulting paving contractors in Vancouver before you pave can prevent costly mistakes. Think about the uses it will have in the years to come and plan ahead.

5. Delaying Sealcoating or Protective Treatments

Both asphalt and concrete benefit from protective sealants. Skipping this step leaves your driveway vulnerable to UV rays, water, and oil stains.

6. Hiring the Wrong Contractor

Not all paving contractors are created equal. A low bid might look attractive, but poor workmanship can cost you far more in repairs down the road. Check out our guide on how to choose your next paving contractor.

Takeaway: If you’re investing in a new driveway, don’t cut corners.

The right preparation, materials, and contractor can make the difference between a driveway that lasts 5 years and one that lasts 25. At Burnaby Blacktop, we make sure every project is built to last, always on time and on budget.

Ready to start your new driveway project? Contact Burnaby Blacktop today for a free estimate.

Get a Free Quote









    * required